Complete package
We supply and install the complete suite of products required for any project requiring a cavity drainage system, including waterproofing membrane, packaged pump stations, control and alarm systems along with the required electrical and pipe work.In person site surveys
We’ll visit your home or business before major works are carried out, so we can provide an accurate quote for the job. We’ll supply a scope of work including any exclusions and clarifications required before the project starts.Commissioning Certification
Once we’re satisfied that the installation is in accordance with manufacturer’s guidelines, we will issue a certification of commissioning to the client, with manuals for all equipment. A warranty of 12 months starts with the transfer of certificate. We’re a
provider – meaning our products and installation are of the highest standards in the industry.
Reassuring aftercare
We provide aftercare services to all customers; no matter how big or small – including
tailored maintenance agreements at amazing rates. We operate a 24/7/365 support line, for assistance on any emergency.
Our Commissioning checklist
- Chamber is clean, and free of any silt/debris which could obstruct the operation of the pumps
- The activation of the float switches can take place, without obstacle If cable joining kits have been used, they will be secured
- Gate valve have been turned anticlockwise to ensure it is fully open
- Electrically isolate the pump to standard height (duty pump), fill the chamber wit water and check that the pump discharges correctly
- Ensure that the high level alarm is working visually and audibly.
- Check for leaks on pipework, ensure all is connected correctly.
- Check all cables are securely ties to the manifold and clear from obstructing float switches Ensure each pump is wired to an individual non-switched spur
- Check each spur is wired to an individual RCBO (not RCD)
- Label the equipment.
- Stickers include contact information for instances where urgent attention is required
- Ensure battery backup is switched on correctly and operates on backup mode
- Run through the operation of the station with the client onsite, advise on best practice for managing a pump station